From this photo you can see the close proximity of the two shopping centers
dangerously close to the Creek and Lagoon and in the path of a 50-year storm.
During construction of the Pacific Coast Highway residual soil was placed on the west
side of the creek bank and then claimed by the Adamson family as their property.

the Adamsons had rip-rap placed along the west streambank. Compare it to the natural state of the east bank.

The California Coastal Commission issued a temporary permit to allow rip rap to be place on the west end of the creek bank to buffer local businesses from flooding. The rip rap still remains.
This 1995 50-year flood brushed up under the Pacific Coast Highway bridge.
CLICK HERE TO SEE THE VIDEO Imagine the impact of a 100-year flood, which is what any development is supposed to sustain according the Malibu's General Plan.
FEMA's 100-year flood plain map of the center of Malibu. SEE LARGER IMAGE


The 1995 50-year flood
inundated the Cross Creek shopping center and the Country Mart.
Looking toward the creek from the
Chili Cookoff property, you can see that both shopping centers, the Country Mart in the foreground and the Cross Creek shopping center are covered by one to two feet of flood water entering from the creek. See the video.

WETLAND RESTORATION

Wetlands are a vital element of our ecosystem. A wetland acts like a filter, much like a kidney, to screen out impurities from water washing off the land, before it enters the ocean. A unique combination of soil, plants and water join together to process waste (called Pathogens, which are bacteria, toxins and heavy metals) out of the water.

The Malibu Creek Wetland is impaired and dysfunctional because of landfill, buildings and parking lots placed on top of it.

WHAT'S THE PROBLEM?

During the 1930's, landfill from the construction of the Pacific Coast Highway was dumped onto the west bank of the Malibu Creek to block the creek flow from entering the center of the wetland, which impaired the natural filtration process.

In the 1960's, landfill from the development of Century City covered up a large area of the wetland center, with ten to twenty feet of dirt, causing further impairment of the filtration process.

More damage followed with the construction of the Cross Creek shopping centers and parking lots that were built dangerously close to the creek in the late 1960s.

Since then, floods have caused sewage spills from restaurants in the these shopping centers, which flow directly into the creek and ocean; heavily contaminating all living species - especially surfers.

Highly toxic oils, grease and anti-freeze left by cars on parking lots are carried off by car washes, hosing off side walks and parking lots, and rain going directly through storm drains, then into the creek and ocean.

The Tapia sewage treatment plant in the upper watershed, Malibu Lake and Westlake release volumes of water into the creek that fills up the lagoon, backs up septic systems and bursts through the beach berm into the surfzone where hundreds of surfers are exposed.

WHAT CAN BE DONE?

1) Expenses aside, in order to restore the ecosystem, the shopping centers and restaurants should be relocated to a less harmful areas such as in the uplands.

2) Remove all unnatural landfill and allow the wetland to reform.

3) Upgrade all on-site waste treatment systems to insure against any possible discharge into the creek or surrounding area. These upgraded systems must sustain a 100-year storm as is required by Malibu's General Plan.

4) Establish a national sanctuary with federal protective laws preserving the wetlands area. The historical wetland area is from the Malibu Lagoon to its west end at the base of the Malibu Villas.

5) Develop an eco-system educational center for visitors from around the world.

6) Short term: Tapia and the lake associations must be compelled to immediately notify all downstream stakeholders in the event of any planned discharge.

7) Officials must be allowed to test all septics in the area and any that are failing must be fixed.

8) Signs must be placed around the historic wetland informing the public of the sensitive nature of the area.

Intro - History - Wetland Restoration - The Tapia Effect - Your Carbon Footprint - Video

 

The Malibu Creek Floodplain/Wetland, circa 1892
Note the ponding held back by the Pacific Coast Highway, circa 1938

The present day Civic Center is an impaired floodplain/wetland because of 10' to 20' of landfill, as well as commercial development placed on top. We hope the acquisition of the Chili Cook Off property (center green open-space) will be the beginning of the restoration process.

This is the Malibu Center Topo Map. It shows the high water table area indicating the historical wetland. Also, a tidal lagoon was indicated at the west end, circa 1899. SEE LARGER IMAGE
Dr. Terry Huffman refers to the topo map that indicates the historical wetlands and hundreds of acres. City Council member Tom Hasse and Joan House indicated there were only 2 acres. See the video
CLICK TO SEE LARGE IMAGE
A through F of first documentation of historical wetland evolution from the UCLA 2000 Study, pg 2-3 CLICK HERE TO SEE LARGE IMAGE
CLICK TO SEE LARGE IMAGE
This is the image City Council members referred to during the political campaign of 2004. Did they make a mistake unintentionally by not referring to image "A"? CLICK HERE TO SEE LARGE IMAGE. See images C thru E in the UCLA 2000 Study
pg 2-3
CLICK TO SEE LARGE IMAGE
CLICK HERE TO SEE LARGE IMAGE




© 2007 The Ugly Clothing Company ("TUCC") - ALL RIGHTS RESERVED